Garment Factory in Ethiopia

Category:
Share on facebook
Share on twitter
Share on linkedin

Location: Mekele, Ethiopia
Dimension: Workshop 01 138m*390m*8.9m, Workshop 02 138m*240m*8.9m.
This project contains 2 workshops, office buildings, staff dormitories and villas, totaling 100,000 square meters. Main frame used Steel Structure portal frame.

PROJECTS Details

The steel used in the construction of steel structure buildings can be recycled and reused, reducing the consumption of natural resources and in line with the concept of sustainable development.

It has a long service life and low maintenance costs, which can reduce the energy consumption and environmental pollution of buildings. Steel structure buildings are commonly found in lightweight industrial plants, warehouses, etc., utilizing the characteristics of fast construction speed, high component processing accuracy, and precise installation dimensions of steel structures.

Related PROJECTS

QQ图片20210909101142_副本
IMG_4166
6415631
Audi in Uruguay 01

Video introduction

Get in touch

Get in touch

To bring high quality products and services to thousands of households